Precautions for use and maintenance of universal testing machine
Release time:
2024-09-09
In the process of testing, some dust will inevitably be generated, such as oxide scale, metal debris, etc. If it is not cleaned in time, it will not only cause wear and scratches on the surface of some parts, but also cause serious consequences such as clogging the valve hole and scratching the piston surface if these dusts enter the hydraulic system of the electro-hydraulic servo universal testing machine. Therefore, it is very necessary to clean after each use.
1. Use appropriate fixtures to complete the corresponding tests, otherwise not only will the test not be ideal, but the fixture will also be damaged:
The electro-hydraulic servo universal testing machine is generally only equipped with fixtures for making standard specimens. If you want to make non-standard specimens, such as steel strands, lap steel, etc., you must add corresponding fixtures. In addition, for some ultra-hard materials, such as spring steel, you must use clips made of special materials, otherwise the fixture will be damaged.
2. Cleaning and cleaning:
In the process of testing, some dust will inevitably be generated, such as oxide scale, metal debris, etc. If it is not cleaned in time, it will not only cause wear and scratches on the surface of some parts, but also cause serious consequences such as clogging the valve hole and scratching the piston surface if these dusts enter the hydraulic system of the electro-hydraulic servo universal testing machine. Therefore, it is very necessary to clean after each use.
3. Hydraulic oil: The oil tank level must be checked regularly and the oil must be replenished in time:
Generally, the oil should be changed every 2000 to 4000 hours of use, and it should be noted that the oil temperature must not exceed 70 degrees. The cooling system must be opened when the oil temperature exceeds 60 degrees.
4. Components should be inspected regularly:
All pressure control valves, pump regulators, and signal devices such as pressure relays, flow control valves, travel switches, and thermal relays must be checked regularly.
5. Filters:
For filters without clogging indicators, they generally need to be replaced every 6 months. For filters with clogging indicators, they must be monitored continuously and must be replaced immediately when the indicator alarms.
6. Cooler:
If water cooling is used, the cooling steel pipe should be regularly checked for cracks and water leakage. If air cooling is used, the scale of the cooler should be cleaned regularly.
Latest News
Recommend a flue pressure testing machine
The precise automatic control and data acquisition system realizes the full digital adjustment of data acquisition and control process. It conducts tests and provides test data according to GB, ISO, JIS, ASTM, DIN, BS and other international standards. It automatically completes the test parameters such as the maximum bearing capacity and strength of the material.
2024-09-09
Spring tension and compression testing machine software function introduction
After the test, the data can be saved automatically or manually. After the test, the maximum force, upper and lower yield strength, Hysteresis loop method, stepwise approximation method, non-proportional extension strength, tensile strength, compressive strength, elongation strength at any point, Elongation at any point with fixed load, elastic modulus, elongation, maximum value, minimum value, average value, net energy of the peeling interval, Reentry energy, total energy, bending modulus, breakpoint displacement x% load, breakpoint load X% displacement, etc.
2024-09-09
High and low temperature spring tension and compression fatigue testing machine features
Embedded high-performance single-chip CPU controller; dot matrix LCD; full Chinese operation display; multi-key operation; automatic memory of parameter settings, automatic connection test at startup, front pickup
2024-09-09
Recommend a locomotive coil spring fatigue testing machine
Main test waveforms: sine wave, triangle wave, square wave, trapezoidal wave, ramp wave and program control wave, etc.
2024-09-09
Introduction of New Electro-hydraulic Pulsation Fatigue Testing Machine
The electro-hydraulic pulsating fatigue testing machine adopts a unique crank-connecting rod rocker mechanism to achieve pulsating sinusoidal wave loading on the test piece. It adopts the best energy-saving design and its energy consumption is one twentieth of that of traditional fatigue equipment!
2024-09-09
Precautions for adjusting the zero point of hydraulic universal testing machine
When the cylinder is not raised, the test force displays a negative value, which is normal. Please do not adjust the zero point.
2024-09-09